Understanding Control Charts in Project Management

blog_auth Blog Author

Vaibhav

published Published

Dec 16, 2024

views Views

2,547

readTime Read Time

15 mins

 

Project managers need to enable precise control and monitoring during planning and execution. Their focus on these aspects leads to its successful completion. One of the most essential tools that I use as a project manager is the control chart. It consistently helps me track and manage processes with great impact. 

Through a control chart in PMP, I have been able to identify variances quickly and make informed decisions. So, in this blog, I will explain about them in detail.

What Is a Control Chart in Project Management?

It is also known as a Shewhart chart or process-behavior chart. It is a statistical tool that is used for monitoring and controlling processes. The main idea is to help you understand two types of changes-

a) Normal changes that always happen in any process

b) Unusual shifts that might indicate the presence of an issue

Also Read: Effective Project Management Strategies For Success

Brief History of Control Charts

While working at Bell Labs, Walter Shewhart invented the visual alert method in process changes.

They use a central line for expected values. They also use two standard deviation-based lines for upper and lower control limits. Normal variations fall within these limits. On the other hand, points outside these lines may indicate issues. 

Tech and statistical advancements mean that you can automatically make a control chart in PMP. You can also add extra lines for stricter process control.

Also Read: PMP Formulas

Importance of Control Charts in Project Management

It is normal for things to evolve a bit from day to day. Small variations usually do not matter much. This is because they probably will not impact the project outcome or bother anyone important. But you might have to check it if there are major variations in the chart. This can indicate a significant matter.

Even as an experienced project manager, I cannot check every little detail in a big or complicated task. That is where a control chart in PMP helps me. It allows me to keep an eye on the progress overall. This vigil alerts me when something is not right.

Also Read: Standard Deviation in Project Management

Benefits of Control Charts

1. Quality: My workplace responsibility is to uphold project quality. A control chart in PMP is very helpful to me as it allows me to keep an eye on the results. They are also easy to use. You have to set control limits on them. Doing this can allow you to detect quality issues early. As a result, you get to take corrective measures fast.

2. Performance checks: A control chart in PMP can let the team continuously monitor performance. It can be a manufacturing process or a project timeline. These charts will give a visual representation of how the process is going. In my work, it helps me identify changes from the expected process and lets me take remedial actions.

3. Decision-making with accurate data: In my opinion, decisions in PMP should be based on data and evidence. Control charts offer a systematic approach to making these judgments. Such insights help you know if the process is under control.

4. Improves the process: A control chart is used to drive continuous improvement when executing projects. It can help you examine the data and identify patterns of common cause variation. This facilitates strategic and timely changes to the process. As a result, you can expect better outcomes.

Enroll in the PMP Classes in Pune to gain hands-on experience with the 49 key processes from the PMBOK Guide-7th edition. This 35-hour live-virtual training equips you with leadership skills and provides lifetime access to class materials.

Types of Control Charts

There are many types visually representing variations in execution. They are each made for specific data types and PMP goals. Here are some of the most commonly used ones-

1. P Chart: This type of control chart in PMP examines the number of defective items in a sample. We normally use it in quality control for discrete data.

2. X-bar and R Chart: This chart is used when gauging the central tendency or average. In addition to that, it checks the variation or range. It is very helpful for processes with continuous data.

3. X-bar and S Chart: It is similar to the X-bar and R chart. But it is mostly used for larger sample sizes. It comes in handy in monitoring the mean and the standard variations of a process. 

4. I-MR Chart: The Individual Moving Range Chart is used for individual data points. It is also used to check their moving ranges. This is very helpful when dealing with small sample sizes.

5. C Chart: It is used to check the number of defects per unit. We normally use it when dealing with count data.

Also Read: Quality Management Tools

Excel Your PMP Certification Exam with Confidence

 

 

Step-By-Step Guide to Creating a Control Chart

Now that you know the basics of a control chart in PMP, we are going to help you create one. Let us begin.

1. Collect data: You need to collect sequential and accurate data to create a PMP control chart. We usually aim for 20-25 subgroups with 4-5 measurements each. Note that it should have at least a total of 100 data points. After this, you need to adjust the frequency and volume based on process stability and output rate. Lastly, be prepared to tweak your strategy as you gain insights.

2. Calculate the centerline: Next, you need to calculate the process baseline. You can do this by determining the mean of your data set. Then, you can sum all data points and divide by their total number. This average becomes the centerline. We use it as a reference to compare individual data points. It also depicts the typical process performance.

3. Define the control limits: You need to calculate control limits at three standard deviations from the mean or σ. For example, you have a mean of 50 and σ of 5. The Upper Control Limit or UCL is 65 (50 + 3*5), and the Lower Control Limit or LCL is 35 (50 - 3*5). These boundaries represent normal process variation. Points outside suggest special-cause variations. This may indicate a potentially out-of-control process.

4. Plot the data: Have you calculated the mean and control limits? Now, it is time to plot your chart. In Excel, you need to select your data and click Insert. Then, choose the line chart option and select the first 2-D one. You can also use a control chart analyzer tool. This can give you instant analysis and feedback when you upload your data.

5. Understand the chart: You can analyse the control chart in PMP by examining points outside control limits and patterns. Outliers indicate special cause variations that require investigation. Trends or unusual clustering within limits may signal underlying issues. These patterns can highlight potential areas for process improvement. This can allow you to do further analysis.

Also Read: Change Control Process

Common Challenges in Implementing Control Charts

Now, let us look at some of the difficulties we professionals face when using a control chart in PMP and how we tackle them.

1. Issues with analyzing results: Interpreting a control chart in PMP is complex. Misinterpretation and inaccurate inferences are common pitfalls. I usually tend to avoid drawing conclusions based on preconceptions. It can help if you do a course to learn proper interpretation techniques.

2. Data collection: The main obstacles are data accuracy issues and resource constraints. Inaccurate data can lead to misleading results. Meanwhile, limited resources can create gaps in data. These challenges make implementing control charts difficult but not impossible! It is crucial to address these problems head-on. This can ensure the effective use of a control chart in PMP in process improvement.

3. Problems with consistency: Maintaining consistency is challenging due to varying data input and inconsistent interpretation standards. Different departments may use diverse approaches to read the PMP control chart. This can cause confusion. Overcoming these obstacles requires discipline and a unified approach. This can ensure consistent and meaningful results.

4. Challenge of training employees: Employee resistance is a major obstacle. Also, quality training programs require significant time and financial investment. In my opinion, overcoming these hurdles is crucial. This is because it can allow you to successfully implement a control chart in PMP in your workplace.

Related Blog: What is PMO

To Conclude

A control chart in PMP is vital in project management. They help monitor processes and make data-driven decisions. They also offer numerous benefits. However, implementing them requires overcoming challenges such as data collection and employee training. You can undergo PMP training to understand control chats better and boost project outcomes.

Also Read: PMP in Healthcare

FAQs

1. How Can I Learn More About Control Charts for PMP Certification?

A control chart is a graph. It displays all the process data in an orderly sequence. It consists of lines that show the upper and lower limits. You can reach out to our team to learn more about a PMP control chart.

2. What Are the Key Components of a Control Chart?

A control chart in PMP consists of data points representing observations. A center line shows the process mean. Meanwhile, the control limits define the expected range. The time axis displays progression. On the other hand, out-of-control indicators alert users to potential issues. These elements allow you to visually monitor the performance of the process.

Share the blog
readTimereadTimereadTime
Name*
Email Id*
Phone Number*

Keep reading about

Card image cap
Project Management
reviews4943
Overview of PMP Certification.
calender05 Jul 2019calender15 mins
Card image cap
Project Management
reviews4509
Why Project Manager should get PMP® Cert...
calender13 Jun 2019calender15 mins
Card image cap
Project Management
reviews5257
What's New in PMBOK 6th Edition
calender20 Jun 2019calender20 mins

Find PMP® Certification in Top Cities

We have
successfully served:

3,00,000+

professionals trained

25+

countries

100%

sucess rate

3,500+

>4.5 ratings in Google

Drop a Query